C CE MH&HV 50/60HZ 10KVA-50000KVA 10KV 15KV 20KV 35KV Three Phase S11 Oil Transformer for Electric Power Distribution

Product Description

Power transformer OEM and ODM
Power transformer
20+ years experience of OEM & ODM in power transformers
Power transformer solutions
Click here to get a price discount
Power transformer application
Power transformer application
Power transformer product parameters
Rated Capacity
Voltage Ratio
Vector Group
No-load Losses (kW)
Impedance
30 kVA
380V/3kV/6kV/11kV/33kV
Dyn11/Yd11/Yyno
0.1
4%
50 kVA
380V/3kV/6kV/11kV/33kV
Dyn11/Yd11/Yyno
0.13
4%
100 kVA
380V/3kV/6kV/11kV/33kV
Dyn11/Yd11/Yyno
0.2
4%
200 kVA
380V/3kV/6kV/11kV/33kV
Dyn11/Yd11/Yyno
0.34
4%
315 kVA
380V/3kV/6kV/11kV/33kV
Dyn11/Yd11/Yyno
0.42
4%
500 kVA
380V/3kV/6kV/11kV/33kV
Dyn11/Yd11/Yyno
0.6
4%
1000 kVA
380V/3kV/6kV/11kV/33kV
Dyn11/Yd11/Yyno
1.15
4.5%
1250 kVA
6kV/11kV/33kV
Dyn11/Yd11/Yyno
—
4.5%
2500 kVA
11kV/33kV
Dyn11/Yd11/Yyno
2.3
—
4000 kVA
11kV/33kV
Dyn11/Yd11/Yyno
2.8
—
10 MVA
11kV/33kV/69kV/110kV
Dyn11/Yd11/Yyno
—
—
40 MVA
11kV/33kV/69kV/110kV
Dyn11/Yd11/Yyno
—
—
100 MVA
11kV/33kV/69kV/110kV/220kV
Dyn11/Yd11/Yyno
—
—
We provide you with customized services. For any questions about the parameters table, size or weight, please contact us.
Power transformer factory
Power transformer production
Sales Performance
Power transformer project
Company Profile
JIANGSU FIRST POWER CO.,LTD.
JIANGSU FIRST POWER CO.,LTD.
JIANGSU FIRST POWER was established in 2004, located in Suzhou City, Jiangsu Province, China, one hour drive from Shanghai. The company mainly produces medium and high voltage 220V to 220kV power transformers, distribution transformers, pad mounted transformers, compact substations, dry transformers, isolation transformers, switchgear, distribution boxes and voltage stabilizers. It occupies 200,000 square meters, with more than 1,000 employees and more than 50 engineers. Our products are widely used in North and South America, the Middle East, Middle Asia, Southeast Asia, Africa, etc.
We have a complete and effective quality control system and test system, strictly based on IEC standard, IEEE standard and ISO standard. We have CE, CCC, CQC, TYPE TEST REPORT, UL, CUL, KEMA, etc. certificates, which improves our company’s competitiveness and supports sustainable development.
We have our own factory, professional R&D, professional design, and professional production lines, which you can trust.
Power transformer factory workshop
Exhibition
Power transformer exhibition
Packing & Delivery
Power transformer transportation
Power transformer packing
FAQ
Q1: Why choose us?
We have a strong R&D team with more than 20 years of transformer design experience. They are familiar with many international transformer standards, such as IEC, IEEE / ANSI, CSA, etc. Excellent and stable quality with the best cost performance. Various payment terms are available.
Q2: Can I visit your factory?
Sure. We warmly welcome your visit to JIANGSU FIRST POWER. Please try to contact our sales representative first by email or phone. We will make an appointment and the most reasonable planning for your transportation.
Q3: What is your minimum order quantity?
Very low MOQ for common items. For customized items, MOQ depends on different requirements.
Q4: What can I buy from you?
400V~220kV oil-immersed power transformers, dry-type transformers, unpacked H Grade dry transformers, oil-immersed distribution transformers, pad mounted transformers, etc.
Q5: Can you offer customized service?
Yes, both OEM and ODM are available. Let us know your idea or requirements for the products, and we will make them perfect for you.
Q6: How long is delivery time and what are your payment terms?
Generally 15-30 days for mass production after the sample is confirmed and the formal PO or deposit is received. Payment terms: credit card, T/T, L/C, Western Union, PayPal, Alipay, etc. 30% down payment or 100% full payment according to your order quantity.

Related Products