| Rated Capacity | Voltage Ratio | Vector Group | No-load Losses (kW) | Impedance |
|---|---|---|---|---|
| 30 kVA | 380V/3kV/6kV/11kV/33kV | Dyn11/Yd11/Yyn0 | 0.1 | 4% |
| 50 kVA | 380V/3kV/6kV/11kV/33kV | Dyn11/Yd11/Yyn0 | 0.13 | 4% |
| 100 kVA | 380V/3kV/6kV/11kV/33kV | Dyn11/Yd11/Yyn0 | 0.2 | 4% |
| 200 kVA | 380V/3kV/6kV/11kV/33kV | Dyn11/Yd11/Yyn0 | 0.34 | 4% |
| 315 kVA | 380V/3kV/6kV/11kV/33kV | Dyn11/Yd11/Yyn0 | 0.42 | 4% |
| 500 kVA | 380V/3kV/6kV/11kV/33kV | Dyn11/Yd11/Yyn0 | 0.6 | 4% |
| 1000 kVA | 380V/3kV/6kV/11kV/33kV | Dyn11/Yd11/Yyn0 | 1.15 | 4.5% |
| 1250 kVA | 6kV/11kV/33kV | Dyn11/Yd11/Yyn0 | 4.5% | |
| 2500 kVA | 11kV/33kV | Dyn11/Yd11/Yyn0 | 2.3 | |
| 4000 kVA | 11kV/33kV | Dyn11/Yd11/Yyn0 | 2.8 | |
| 10 MVA | 11kV/33kV/69kV/110kV | Dyn11/Yd11/Yyn0 | ||
| 40 MVA | 11kV/33kV/69kV/110kV | Dyn11/Yd11/Yyn0 | ||
| 100 MVA | 11kV/33kV/69kV/110kV/220kV | Dyn11/Yd11/Yyn0 |














JIANGSU FIRST POWER was established in 2004, located at Suzhou City, Jiangsu Province China, one hour drive from Shanghai. mainly produces medium and high voltage of 220v to 220kv power transformer, distribution transformer, pad mounted transformer, compact substation, dry transformer, isolation transformer, switchgear, distribution box, voltage stabilizer, occupies 200.000 square meter, more than 1000 employees, more than 50 engineers. Our products are widely used in North and South America, Middle East, Middle Asia, Southeast Asia, Africa, etc. We have complete and effective quality control system and test system, strictly based on IEC standard, IEEE standard, ISO standard. We have CE, CCC, CQC, TYPE TEST REPORT, UL, CUL, KEMA, etc certificates, which improves our company’s competitiveness and achieve company’s development sustainably.
We have our own factory, professional R&D, professional design, and professional production lines, which you can trust.

















A1: We have strong R&D team and they have more than 20 years of transformer design experience and are familiar with lots of international transformer standards, such as IEC, IEEE / ANSI, CSA, etc., and instruments with more than 20 years’ experience. Excellent and stable quality with best cost performance. Various payment terms are available.
A2: Sure, warmly welcome your visit to JIANGSU FIRST POWER. Please try to contact our sales representative first by email or phone. We will make the appointment and the most reasonable planning for your transportation.
A3: Very low MOQ for common items. For customized items, it depends on different requirements.
A4: 400V–220kV Oil-immersed Power Transformer, Dry-type Transformer, Unpacked H Grade Dry Transformer, Oil-immersed Distribution Transformer, Pad mounted Transformer, etc.
A5: Yes, both OEM and ODM are available. Let me know your idea or requirements on the products, we make it perfect for you.
A6: Generally 15–30 days for mass production after sample confirmed and the receipt of formal PO or deposit.